Skip Navigation

enterpriseinfo's blog

EIS Steering Committee - 20081105

The EIS Steering Committee addressed 17 Compass requests by different departments.

The upgrade to Banner 8 was discussed; the Banner system will have to go offline for the upgrades to take place, so it will be done before Thanksgiving break so work can be done during the break. The system should be back online after the break

Syndicate content